title: The Avery — Mixed-Use, Brooklyn — Meridian Build
description: Project case study — The Avery, Brooklyn.
---

[![Meridian Build](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/logos/meridian-build-white.png) ![Meridian Build](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/logos/meridian-build-black.png)](https://www.nopethemes.com/meridian-build?hsLang=en)

MENU

×

[![Meridian Build](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/logos/meridian-build-black.png)](https://www.nopethemes.com/meridian-build?hsLang=en)

- [Home](https://www.nopethemes.com/meridian-build?hsLang=en)
- [About](https://www.nopethemes.com/meridian-build/company?hsLang=en)
- [Solutions](https://www.nopethemes.com/meridian-build/solutions?hsLang=en)
- [Expertise](https://www.nopethemes.com/meridian-build/expertise?hsLang=en)
  
  
  
  
  
    - [Commercial Real Estate](https://www.nopethemes.com/meridian-build/sector/commercial-real-estate?hsLang=en)
    - [Aviation](https://www.nopethemes.com/meridian-build/sector/aviation?hsLang=en)
    - [Sport & Leisure](https://www.nopethemes.com/meridian-build/sector/sport-leisure?hsLang=en)
- [Projects](https://www.nopethemes.com/meridian-build/gallery?hsLang=en)
  
  
  
  
  
    - [All projects](https://www.nopethemes.com/meridian-build/gallery?hsLang=en)
    - [Featured case study](https://www.nopethemes.com/meridian-build/project?hsLang=en)
- [Responsibility](https://www.nopethemes.com/meridian-build/responsibility?hsLang=en)
- [Careers](https://www.nopethemes.com/meridian-build/careers?hsLang=en)
- Insights
  
  
  
  
  
    - [Journal](https://www.nopethemes.com/meridian-build/blog?hsLang=en)
    - [News](https://www.nopethemes.com/meridian-build/news?hsLang=en)
    - [Resources](https://www.nopethemes.com/meridian-build/resources?hsLang=en)
- [Contact](https://www.nopethemes.com/meridian-build/contact?hsLang=en)

![The Avery — completed mixed-use development, Brooklyn](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-1.jpg)

# The Avery — Mixed-Use, Brooklyn

A 320,000 sq ft mixed-use scheme combining 184 residential units, 28,000 sq ft of street-level retail, and a public courtyard tying two formerly disconnected blocks together. Delivered May 2025.

The brief

## A development that had to feel like the neighbourhood, not impose on it

The client — a Brooklyn-based developer with three previous projects in the borough — came to us with a permitted scheme and a problem. The original GC had walked at week 14 over a structural-steel cost dispute, and the design team's drawings still had open coordination flags around the podium-deck transfer.

We took on the project as design-build, picked up the design coordination through our in-house engineering team, and re-tendered the steel package within six weeks. The client's original delivery date held — but only because we wrote the schedule from the bottom up rather than inheriting the previous team's plan.

![Site progress, Q3 2024](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-1.jpg)

From the field

## The Avery, in pictures

Site progress, hand-over photos, and the moments in between — captured by our project photographer over 22 months on site.

![The Avery — completed facade](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-1.jpg)

Completed facade — Bedford Avenue elevation

![Final podium and tower volume](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-8.jpg)

Podium-tower transition at handover

![Underpinning works on party wall](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-2.jpg)

Underpinning the 1908 party wall — week 6

![Modular MEP riser being craned in](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-11.jpg)

Modular MEP riser — night-shift lift

![Tower crane during steel erection](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-4.jpg)

Steel erection — level 9 platform

![Public courtyard, post-completion](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-7.jpg)

Public courtyard — first community event

![Curtain wall installation](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-6.jpg)

Curtain wall installation — week 64

![Lobby fit-out at handover](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-12.jpg)

Residential lobby — pre-occupancy walk

The Avery, by the numbers

## A 22-month delivery, end to end

- 320,000 sq ft Total floor area
  
  184 residential + 12 retail + courtyard
- 0 mo On site
  
  Recovery schedule, hit on day one
- $1.8m Returned to client
  
  Open-book savings vs GMP
- 0 Recordable incidents
  
  Across 320,000 site-hours

Challenges

## A site with no margin for error

The site sat between two occupied buildings with party walls dating to 1908. Foundation work required underpinning a six-storey neighbour while keeping its tenants in occupation. Two of those tenants ran ground-floor businesses where vibration would have stopped trade.

We worked with a vibration-monitoring specialist to install real-time sensors before any pile work started, set thresholds 40% below code minimum, and built the schedule around windows when the affected businesses were closed. Zero claims, zero downtime for the neighbours, zero programme slippage.

![Underpinning works on the party wall](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-2.jpg)

Approach

## Self-perform concrete, modular MEP

We self-performed the structural concrete — slab on grade through level 14 — using a single tower crane and a 28-day pour cycle that gave the steel and facade trades predictable hand-offs. The MEP risers were pre-fabricated off-site in 12-foot modules, lifted into place during the night-shift window, and connected with quick-disconnect fittings. That alone saved 47 site days.

The podium-deck transfer — the hand-off point that derailed the previous team — was redesigned as a hybrid steel-concrete composite truss. We tendered and built it in eight weeks, ten days ahead of the redrawn schedule.

![Modular MEP riser being craned into position](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-11.jpg)

Recovery takeover

## Week 14 condition vs. handover

Drag to compare the site as we found it — abandoned by the original GC mid-pour — with the completed Bedford Avenue elevation 22 months later.

![The Avery — completed Bedford Avenue elevation](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-8.jpg) Handover

![Avery site at week 14 — recovery takeover condition](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-2.jpg) Week 14

Results

## Delivered on the original date, $1.8m under final budget

Substantial completion was issued 11 days ahead of the recovery schedule, matching the developer's original target despite the 14-week delay we inherited. Final cost was $1.8m under the contracted GMP, with the savings returned to the client per our open-book agreement.

184 units leased within 90 days of TCO. The retail spaces were fully signed before practical completion. The public courtyard — a contractual community-amenity requirement — has become a regular venue for the Bedford-Stuyvesant Restoration Corporation's summer programming.

[DISCUSS YOUR PROJECT](https://www.nopethemes.com/meridian-build/contact?hsLang=en)

![Public courtyard, post-completion](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-7.jpg)

In their words

> “Meridian Build inherited a project that was 14 weeks behind, with our original GC walked off site and a half-poured podium deck nobody wanted to claim. They ran a 30-day audit, rewrote the schedule from the bottom up, and brought the building in on the original handover date — $1.8m under our GMP. Eleven years and four projects later, they're still our default choice.”

![Robert Chen](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/portrait-3.jpg)

Robert Chen  Managing Partner · Bedford-Stuyvesant Development Partners

Project facts

## The Avery, by the numbers

- ### Client
  
  Bedford-Stuyvesant Development Partners
- ### Location
  
  Brooklyn, NY
- ### Sector
  
  Mixed-use residential + retail
- ### Floor area
  
  320,000 sq ft
- ### Units
  
  184 residential, 12 retail
- ### Procurement
  
  Design-build (rescue takeover)
- ### Programme
  
  22 months on site
- ### Completed
  
  May 2025

Related work

## Other mixed-use projects

- ### [![Holloway District Mixed-Use](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-6.jpg) 01 Holloway District Mixed-Use London, UK](https://www.nopethemes.com/meridian-build/project/sample-project?hsLang=en)
- ### [![Marlow Design District](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-4.jpg) 02 Marlow Design District Toronto, ON](https://www.nopethemes.com/meridian-build/project/sample-project?hsLang=en)
- ### [![Linden Wharf Redevelopment](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-9.jpg) 03 Linden Wharf Redevelopment Hamburg, DE](https://www.nopethemes.com/meridian-build/project/sample-project?hsLang=en)

[ALL PROJECTS](https://www.nopethemes.com/meridian-build/expertise?hsLang=en)

Working on something similar?

## Bring the brief, even if it's already in motion.

Roughly a fifth of our work is rescue or takeover. If your project needs a fresh team, we'll tell you within a week whether we're the right fit.

[GET IN TOUCH](https://www.nopethemes.com/meridian-build/contact?hsLang=en)

![Construction site overview](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/templates/helper-img-11.jpg)

[![Meridian Build](https://www.nopethemes.com/hubfs/raw_assets/public/studionope-for-construction/images/logos/meridian-build-white.png)](https://www.nopethemes.com/meridian-build?hsLang=en)

Building enduring places across sectors and continents.

#### Pages

- [Home](https://www.nopethemes.com/meridian-build?hsLang=en)
- [About](https://www.nopethemes.com/meridian-build/company?hsLang=en)
- [Solutions](https://www.nopethemes.com/meridian-build/solutions?hsLang=en)
- [Expertise](https://www.nopethemes.com/meridian-build/expertise?hsLang=en)
- [Projects](https://www.nopethemes.com/meridian-build/gallery?hsLang=en)
- [Featured case study](https://www.nopethemes.com/meridian-build/project?hsLang=en)
- [Responsibility](https://www.nopethemes.com/meridian-build/responsibility?hsLang=en)
- [Careers](https://www.nopethemes.com/meridian-build/careers?hsLang=en)
- [Contact](https://www.nopethemes.com/meridian-build/contact?hsLang=en)
- [Documentation](https://www.nopethemes.com/meridian-build/docs?hsLang=en)

#### Insights

- [Journal](https://www.nopethemes.com/meridian-build/blog?hsLang=en)
- [News](https://www.nopethemes.com/meridian-build/news?hsLang=en)
- [Resources](https://www.nopethemes.com/meridian-build/resources?hsLang=en)

#### Sectors

- [Commercial Real Estate](https://www.nopethemes.com/meridian-build/sector/commercial-real-estate?hsLang=en)
- [Aviation](https://www.nopethemes.com/meridian-build/sector/aviation?hsLang=en)
- [Sport & Leisure](https://www.nopethemes.com/meridian-build/sector/sport-leisure?hsLang=en)

#### Locations

- [All offices](https://www.nopethemes.com/meridian-build/locations?hsLang=en)
- [Brooklyn](https://www.nopethemes.com/meridian-build/locations#brooklyn)
- [Manchester](https://www.nopethemes.com/meridian-build/locations#manchester)
- [Austin](https://www.nopethemes.com/meridian-build/locations#austin)
- [Singapore](https://www.nopethemes.com/meridian-build/locations#singapore)
- [Lagos](https://www.nopethemes.com/meridian-build/locations#lagos)

- Terms & Conditions
- Privacy Policy
- Cookie Policy

© 2026 Meridian Build